Research on the Prewarning Method for the Safety of South-to-North Water Transfer Project Driven by Monitoring Data
In order to solve the prewarning problem of South-to-North Water Transfer Project safety, an intelligent cooperative prewarning method based on machine learning was proposed under the framework of intelligent information processing. Driven by the monitoring data of the South-to-North Water Transfer...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2018-01-01
|
Series: | Scientific Programming |
Online Access: | http://dx.doi.org/10.1155/2018/3287065 |