Time–cost tradeoff analysis considering funding variability and time uncertainty
This paper presents a linear programming model for solution of the time–cost tradeoff problem. Although several analytical models have been developed for time–cost optimization (TCO), some of them mainly focused on projects where the contract duration is fixed. The optimization objective is therefor...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2013-03-01
|
Series: | Alexandria Engineering Journal |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S1110016812000531 |