Time–cost tradeoff analysis considering funding variability and time uncertainty

This paper presents a linear programming model for solution of the time–cost tradeoff problem. Although several analytical models have been developed for time–cost optimization (TCO), some of them mainly focused on projects where the contract duration is fixed. The optimization objective is therefor...

Full description

Bibliographic Details
Main Author: Amr Metwally El-kholy
Format: Article
Language:English
Published: Elsevier 2013-03-01
Series:Alexandria Engineering Journal
Subjects:
Online Access:http://www.sciencedirect.com/science/article/pii/S1110016812000531