Using Markov Chain to Analyze Production Lines Systems with Layout Constraints
There are some problems with estimating the time required for the manufacturing process of products, especially when there is a variable serving time, like control stage. These problems will cause overestimation of process time. Layout constraints, reworking constraints and inflexible product schedu...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Islamic Azad University, Qazvin Branch
2010-02-01
|
Series: | Journal of Optimization in Industrial Engineering |
Subjects: | |
Online Access: | http://www.qjie.ir/article_17_a022d228258b7d443bd9b7670d6955c5.pdf |