Optimizing the Long-Term Operating Plan of Railway Marshalling Station for Capacity Utilization Analysis

Not only is the operating plan the basis of organizing marshalling station’s operation, but it is also used to analyze in detail the capacity utilization of each facility in marshalling station. In this paper, a long-term operating plan is optimized mainly for capacity utilization analysis. Firstly,...

Full description

Bibliographic Details
Main Authors: Wenliang Zhou, Xia Yang, Jin Qin, Lianbo Deng
Format: Article
Language:English
Published: Hindawi Limited 2014-01-01
Series:The Scientific World Journal
Online Access:http://dx.doi.org/10.1155/2014/251315