Robust Parallel Machine Scheduling Problem with Uncertainties and Sequence-Dependent Setup Time
A parallel machine scheduling problem in plastic production is studied in this paper. In this problem, the processing time and arrival time are uncertain but lie in their respective intervals. In addition, each job must be processed together with a mold while jobs which belong to one family can shar...
Main Authors: | Hongtao Hu, K. K. H. Ng, Yichen Qin |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2016-01-01
|
Series: | Scientific Programming |
Online Access: | http://dx.doi.org/10.1155/2016/5127253 |
Similar Items
-
Unrelated parallel machine scheduling problem with sequence dependent setup times
by: Pei Hsuan Lin, et al.
Published: (2013) -
Parallel Machine Scheduling with Sequence-Dependent Setup Times
by: Hsu, Li-Ho, et al.
Published: (2019) -
Scheduling on unrelated parallel machines with sequence dependent setup times
by: Guilherme Etcheverry, et al.
Published: (2014-08-01) -
Parallel-machine scheduling with load-balancing and sequence-dependent setups
by: Senniappan, Karthikeyan
Published: (2007) -
An Improved Firefly Algorithm for the Unrelated Parallel Machines Scheduling Problem With Sequence-Dependent Setup Times
by: Absalom E. Ezugwu, et al.
Published: (2018-01-01)