Robust Parallel Machine Scheduling Problem with Uncertainties and Sequence-Dependent Setup Time

A parallel machine scheduling problem in plastic production is studied in this paper. In this problem, the processing time and arrival time are uncertain but lie in their respective intervals. In addition, each job must be processed together with a mold while jobs which belong to one family can shar...

Full description

Bibliographic Details
Main Authors: Hongtao Hu, K. K. H. Ng, Yichen Qin
Format: Article
Language:English
Published: Hindawi Limited 2016-01-01
Series:Scientific Programming
Online Access:http://dx.doi.org/10.1155/2016/5127253