Optimization of shut-in time before drilling for each strata system in the drilling pass area in Block G
After the A oilfield enters the ultra-high water cut period, the production level is high, the comprehensive water cut is high and the production level is high. In recent years, the number of new wells has increased considerably, affecting the increase in production year by year. Faced with these tw...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2021-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/09/e3sconf_iaecst20_01035.pdf |