Production Lot Sizing and Process Targeting under Process Deterioration and Machine Breakdown Conditions
The paper considers a production facility that might deteriorate suddenly at some point during the production run time; after deterioration, nonconforming items are produced in a greater rate compared to the rate before deterioration. Moreover, the production facility may ultimately break down; cons...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2012-01-01
|
Series: | Modelling and Simulation in Engineering |
Online Access: | http://dx.doi.org/10.1155/2012/393495 |
Summary: | The paper considers a production facility that might deteriorate suddenly at some point during the production run time; after deterioration, nonconforming items are produced in a greater rate compared to the rate before deterioration. Moreover, the production facility may ultimately break down; consequently, the production lot is aborted before completion. If breakdown happens, corrective action is started immediately; otherwise, the production lot is completed and preventive repair is implemented at the end of the production cycle to enhance system reliability. The mathematical model is formulated under general distributions of failure, corrective, and repair times, while the numerical examples are solved under exponential failure and uniform repair times. The formulated model successfully determines the optimal lot size in addition to the optimal process parameters (mean and standard deviation) simultaneously. |
---|---|
ISSN: | 1687-5591 1687-5605 |