Production Lot Sizing and Process Targeting under Process Deterioration and Machine Breakdown Conditions
The paper considers a production facility that might deteriorate suddenly at some point during the production run time; after deterioration, nonconforming items are produced in a greater rate compared to the rate before deterioration. Moreover, the production facility may ultimately break down; cons...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2012-01-01
|
Series: | Modelling and Simulation in Engineering |
Online Access: | http://dx.doi.org/10.1155/2012/393495 |