IMPROVEMENT FOR AN ASSEMBLY FLOW FOR A GIVEN COMPONENT (1)
This study is carried out in a line of assembly of a finite wiring product. The assembly of this finished product is done in two specific sections. For the analysis of the activities in the assembly section, the timing method of the work stations was used. On the basis of the work times obtained...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Academica Brancusi
2017-05-01
|
Series: | Fiabilitate şi Durabilitate |
Subjects: | |
Online Access: | http://www.utgjiu.ro/rev_mec/mecanica/pdf/2017-01/28_Ancu%C5%A3a%20B%C4%82LTEANU,%20Monica%20B%C3%82LDEA%20-%20IMPROVEMENT%20FOR%20AN%20ASSEMBLY%20FLOW%20FOR%20A%20GIVEN%20COMPONENT%20(1).pdf |