Analisis Percepatan Waktu Dan Biaya Proyek Konstruksi Dengan Penambahan Jam Kerja (Lembur) Menggunakan Metode Time Cost Trade Off : Studi Kasus Proyek Pembangunan Prasarana Pengendali Banjir

<span>Time and cost have significanteffect on the success and failure of the projects.The<br /><span>benchmark for the success project is usually seen by short finishing time with the<br /><span>minimum cost without leaving the quality.Project management systematically...