Risk Indicators of Water Network Operation
Indicators used for water pipe risk assessment are shown. The paper contains an example of risk assessment for a part of water distributing network using an expected equivalent resident water demand as a measurement of risk. This indicator clearly evaluates the consequences of pipe failures and at t...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
AIDIC Servizi S.r.l.
2012-05-01
|
Series: | Chemical Engineering Transactions |
Online Access: | https://www.cetjournal.it/index.php/cet/article/view/7417 |