Stabilization of wind farm integrated transmission system with input delay
In the process of large-scale wind farms integration, the time delay is usually caused by the introduction of wide area control signal, which leads to the unstable operation of integrated transmission system. In order to solve this problem, using the control principle of interconnection and damping...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
AIMS Press
2021-06-01
|
Series: | AIMS Mathematics |
Subjects: | |
Online Access: | https://www.aimspress.com/article/doi/10.3934/math.2021533?viewType=HTML |