Two parametric functional dependents of time for construction of horizontal mining facilities in gneiss and schist
This paper presents the analysis of the construction of horizontal mining facilities where 18 variants of mining facilities were developed. The aim of this research was to determine the required time for construction of all variants and then to reduce it to the time required for construction of 1 m`...
Main Authors: | Doneva Nikolinka, Despodov Zoran, Mirakovski Dejan, Hadzinikolova Marija, Mijalkovski Stojanče |
---|---|
Format: | Article |
Language: | English |
Published: |
Faculty of Mining and Geology, Belgrade
2019-01-01
|
Series: | Podzemni Radovi |
Subjects: | |
Online Access: | https://scindeks-clanci.ceon.rs/data/pdf/0354-2904/2019/0354-29041934001D.pdf |
Similar Items
-
Reasons for difference between real and projected operating supplies for supporting during construction of ramps
by: Doneva Nikolinka, et al.
Published: (2016-01-01) -
COST ANALYSIS IN CONSTRUCTION OF UNDERGROUND MINING STRUCTURES AND OPPORTUNITIES FOR THEIR REDUCTION
by: Nikolinka Doneva, et al.
Published: (2015-12-01) -
Methodology for optimization of coefficient for ore recovery in sublevel caving mining method
by: Stojance Mijalkovski, et al.
Published: (2017-01-01) -
Investigating the Anisotropy of Mechanical Parameters of Schist Rock with Practical Numerical Methods
by: Zhen Cui, et al.
Published: (2021-01-01) -
Simulation and optimization of evacuation routes in case of fire in underground mines
by: Vancho Adjiski, et al.
Published: (2015-01-01)