Two parametric functional dependents of time for construction of horizontal mining facilities in gneiss and schist
This paper presents the analysis of the construction of horizontal mining facilities where 18 variants of mining facilities were developed. The aim of this research was to determine the required time for construction of all variants and then to reduce it to the time required for construction of 1 m`...