Use of the cross-type dowels when connecting elements of timber bridges
The use of cross-type dowels that are battered down with a gunshot method makes it possible to reduce labor intensity and speed up the process of erection and reconstruction of timber bridges. Objective of this paper is to develop a methodology for estimation of the permissible distance between dowe...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://doi.org/10.1051/matecconf/201821601007 |