Time reduction effects of steel connected precast concrete components for heavily loaded long-span buildings
The characteristics of large logistics buildings are their long spans and the ability to take heavy loads. Usually, PC components are used for their frames to ensure quick construction. However, the erection of most pin jointed PC structures increases the time and the cost incurred for ensuring str...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Vilnius Gediminas Technical University
2020-02-01
|
Series: | Journal of Civil Engineering and Management |
Subjects: | |
Online Access: | https://journals.vgtu.lt/index.php/JCEM/article/view/11673 |