Time reduction effects of steel connected precast concrete components for heavily loaded long-span buildings

The characteristics of large logistics buildings are their long spans and the ability to take heavy loads. Usually, PC components are used for their frames to ensure quick construction. However, the erection of most pin jointed PC structures increases the time and the cost incurred for ensuring str...

Full description

Bibliographic Details
Main Authors: Ho-Haeng Lee, Ki-Ho Kim, Seunghyun Son, Kwangheon Park, Sunkuk Kim
Format: Article
Language:English
Published: Vilnius Gediminas Technical University 2020-02-01
Series:Journal of Civil Engineering and Management
Subjects:
Online Access:https://journals.vgtu.lt/index.php/JCEM/article/view/11673