Pseudo-Steady-State Productivity Formula for a Partially Penetrating Vertical Well in a Box-Shaped Reservoir

For a bounded reservoir with no flow boundaries, the pseudo-steady-state flow regime is common at long-producing times. Taking a partially penetrating well as a uniform line sink in three dimensional space, by the orthogonal decomposition of Dirac function and using Green's function to three-di...

Full description

Bibliographic Details
Main Authors: Jing Lu, Djebbar Tiab
Format: Article
Language:English
Published: Hindawi Limited 2010-01-01
Series:Mathematical Problems in Engineering
Online Access:http://dx.doi.org/10.1155/2010/907206