Pseudo-Steady-State Productivity Formula for a Partially Penetrating Vertical Well in a Box-Shaped Reservoir
For a bounded reservoir with no flow boundaries, the pseudo-steady-state flow regime is common at long-producing times. Taking a partially penetrating well as a uniform line sink in three dimensional space, by the orthogonal decomposition of Dirac function and using Green's function to three-di...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2010-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2010/907206 |