The Possibility of Capacity Increase on the Modernised and Electrified Railway Line R201 along the Zaprešić – Zabok Section

This paper is focused on the regional railway track line R201 which begins at the Zaprešić railway station (who is a part of the M101 railway line - part of this Mediterranean corridor) and it separates itself from the international Mediterranean TEN-T corridor. In the forthcoming period is planned...

Full description

Bibliographic Details
Main Authors: Ljubaj Ivica, Mlinarić Tomislav Josip, Ležaić Tomislav, Starčević Martin
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:MATEC Web of Conferences
Online Access:https://doi.org/10.1051/matecconf/201823500009
id doaj-9410b3cdcd61466880d8df50528d75ce
record_format Article
spelling doaj-9410b3cdcd61466880d8df50528d75ce2021-02-02T05:39:12ZengEDP SciencesMATEC Web of Conferences2261-236X2018-01-012350000910.1051/matecconf/201823500009matecconf_hort2018_00009The Possibility of Capacity Increase on the Modernised and Electrified Railway Line R201 along the Zaprešić – Zabok SectionLjubaj Ivica0Mlinarić Tomislav Josip1Ležaić Tomislav2Starčević Martin3University of Zagreb Faculty of Traffic and Transport ScienceUniversity of Zagreb Faculty of Traffic and Transport ScienceUniversity of Zagreb Faculty of Traffic and Transport ScienceUniversity of Zagreb Faculty of Traffic and Transport ScienceThis paper is focused on the regional railway track line R201 which begins at the Zaprešić railway station (who is a part of the M101 railway line - part of this Mediterranean corridor) and it separates itself from the international Mediterranean TEN-T corridor. In the forthcoming period is planned electrification and modernization of the R201 railway line, so this paper will be focused on capacity calculation as well on the utilization of the new available capacity. There will be made simulation, with the Opentrack program package for railway simulation, of the possibility to equip this line with the ETCS Level 1 and Level 2 safety systems and then it will be made comparation of the results (available capacity) obtained by simulations with the results without having equipped track with these modern safety systems. As the main idea of electrification and modernization of this track is to include her in the suburban passenger system of the city of Zagreb and to transport freight by railway, there will be given some suggestions how to improve capacity utilization.https://doi.org/10.1051/matecconf/201823500009
collection DOAJ
language English
format Article
sources DOAJ
author Ljubaj Ivica
Mlinarić Tomislav Josip
Ležaić Tomislav
Starčević Martin
spellingShingle Ljubaj Ivica
Mlinarić Tomislav Josip
Ležaić Tomislav
Starčević Martin
The Possibility of Capacity Increase on the Modernised and Electrified Railway Line R201 along the Zaprešić – Zabok Section
MATEC Web of Conferences
author_facet Ljubaj Ivica
Mlinarić Tomislav Josip
Ležaić Tomislav
Starčević Martin
author_sort Ljubaj Ivica
title The Possibility of Capacity Increase on the Modernised and Electrified Railway Line R201 along the Zaprešić – Zabok Section
title_short The Possibility of Capacity Increase on the Modernised and Electrified Railway Line R201 along the Zaprešić – Zabok Section
title_full The Possibility of Capacity Increase on the Modernised and Electrified Railway Line R201 along the Zaprešić – Zabok Section
title_fullStr The Possibility of Capacity Increase on the Modernised and Electrified Railway Line R201 along the Zaprešić – Zabok Section
title_full_unstemmed The Possibility of Capacity Increase on the Modernised and Electrified Railway Line R201 along the Zaprešić – Zabok Section
title_sort possibility of capacity increase on the modernised and electrified railway line r201 along the zaprešić – zabok section
publisher EDP Sciences
series MATEC Web of Conferences
issn 2261-236X
publishDate 2018-01-01
description This paper is focused on the regional railway track line R201 which begins at the Zaprešić railway station (who is a part of the M101 railway line - part of this Mediterranean corridor) and it separates itself from the international Mediterranean TEN-T corridor. In the forthcoming period is planned electrification and modernization of the R201 railway line, so this paper will be focused on capacity calculation as well on the utilization of the new available capacity. There will be made simulation, with the Opentrack program package for railway simulation, of the possibility to equip this line with the ETCS Level 1 and Level 2 safety systems and then it will be made comparation of the results (available capacity) obtained by simulations with the results without having equipped track with these modern safety systems. As the main idea of electrification and modernization of this track is to include her in the suburban passenger system of the city of Zagreb and to transport freight by railway, there will be given some suggestions how to improve capacity utilization.
url https://doi.org/10.1051/matecconf/201823500009
work_keys_str_mv AT ljubajivica thepossibilityofcapacityincreaseonthemodernisedandelectrifiedrailwayliner201alongthezapresiczaboksection
AT mlinarictomislavjosip thepossibilityofcapacityincreaseonthemodernisedandelectrifiedrailwayliner201alongthezapresiczaboksection
AT lezaictomislav thepossibilityofcapacityincreaseonthemodernisedandelectrifiedrailwayliner201alongthezapresiczaboksection
AT starcevicmartin thepossibilityofcapacityincreaseonthemodernisedandelectrifiedrailwayliner201alongthezapresiczaboksection
AT ljubajivica possibilityofcapacityincreaseonthemodernisedandelectrifiedrailwayliner201alongthezapresiczaboksection
AT mlinarictomislavjosip possibilityofcapacityincreaseonthemodernisedandelectrifiedrailwayliner201alongthezapresiczaboksection
AT lezaictomislav possibilityofcapacityincreaseonthemodernisedandelectrifiedrailwayliner201alongthezapresiczaboksection
AT starcevicmartin possibilityofcapacityincreaseonthemodernisedandelectrifiedrailwayliner201alongthezapresiczaboksection
_version_ 1724303181398147072