The Possibility of Capacity Increase on the Modernised and Electrified Railway Line R201 along the Zaprešić – Zabok Section
This paper is focused on the regional railway track line R201 which begins at the Zaprešić railway station (who is a part of the M101 railway line - part of this Mediterranean corridor) and it separates itself from the international Mediterranean TEN-T corridor. In the forthcoming period is planned...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://doi.org/10.1051/matecconf/201823500009 |