The Possibility of Capacity Increase on the Modernised and Electrified Railway Line R201 along the Zaprešić – Zabok Section

This paper is focused on the regional railway track line R201 which begins at the Zaprešić railway station (who is a part of the M101 railway line - part of this Mediterranean corridor) and it separates itself from the international Mediterranean TEN-T corridor. In the forthcoming period is planned...

Full description

Bibliographic Details
Main Authors: Ljubaj Ivica, Mlinarić Tomislav Josip, Ležaić Tomislav, Starčević Martin
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:MATEC Web of Conferences
Online Access:https://doi.org/10.1051/matecconf/201823500009
Description
Summary:This paper is focused on the regional railway track line R201 which begins at the Zaprešić railway station (who is a part of the M101 railway line - part of this Mediterranean corridor) and it separates itself from the international Mediterranean TEN-T corridor. In the forthcoming period is planned electrification and modernization of the R201 railway line, so this paper will be focused on capacity calculation as well on the utilization of the new available capacity. There will be made simulation, with the Opentrack program package for railway simulation, of the possibility to equip this line with the ETCS Level 1 and Level 2 safety systems and then it will be made comparation of the results (available capacity) obtained by simulations with the results without having equipped track with these modern safety systems. As the main idea of electrification and modernization of this track is to include her in the suburban passenger system of the city of Zagreb and to transport freight by railway, there will be given some suggestions how to improve capacity utilization.
ISSN:2261-236X