Stabilization of clayey subgrade with waste pumice for road infrastructure
High-plasticity clayey subgrade, which is unsuitable for road construction, may sometimes occur along highway routes. In such cases, engineers need to change the route of a highway project, resulting in an increase in road length and project costs. In this study, waste pumice was examined for stabil...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
De Gruyter
2015-09-01
|
Series: | Science and Engineering of Composite Materials |
Subjects: | |
Online Access: | https://doi.org/10.1515/secm-2013-0315 |