Reactive Strategies in the Multiproject Scheduling with Multifactor Disruptions

Multiproject scheduling aims at the generation of the baseline schedules, which has been studied for several years with the goal of minimizing the total cost of the project. In this paper, we analyzed the impact of network structure disruption, activity disruption, and resource disruption on schedul...

Full description

Bibliographic Details
Main Authors: Weixin Wang, Jiafu Su, Jin Xu, Xianlong Ge
Format: Article
Language:English
Published: Hindawi Limited 2020-01-01
Series:Mathematical Problems in Engineering
Online Access:http://dx.doi.org/10.1155/2020/3154047