Reactive Strategies in the Multiproject Scheduling with Multifactor Disruptions
Multiproject scheduling aims at the generation of the baseline schedules, which has been studied for several years with the goal of minimizing the total cost of the project. In this paper, we analyzed the impact of network structure disruption, activity disruption, and resource disruption on schedul...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2020-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/3154047 |