Study of Tunnel Damage Caused by Underground Mining Deformation: Calculation, Analysis, and Reinforcement

Bayueshan tunnel (BYS) is an important construction crossing over coal mine goaf. The underground mining subsidence has led the tunnel cracked seriously in three years after it was built. In order to evaluate the coal mine influence and future stability of the tunnels, probability integral method (P...

Full description

Bibliographic Details
Main Authors: Peixian Li, Lili Yan, Dehua Yao
Format: Article
Language:English
Published: Hindawi Limited 2019-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2019/4865161