An Improved Multiobjective PSO for the Scheduling Problem of Panel Block Construction

Uncertainty is common in ship construction. However, few studies have focused on scheduling problems under uncertainty in shipbuilding. This paper formulates the scheduling problem of panel block construction as a multiobjective fuzzy flow shop scheduling problem (FSSP) with a fuzzy processing time,...

Full description

Bibliographic Details
Main Authors: Zhi Yang, Cungen Liu, Xuefeng Wang, Weixin Qian
Format: Article
Language:English
Published: Hindawi Limited 2016-01-01
Series:Discrete Dynamics in Nature and Society
Online Access:http://dx.doi.org/10.1155/2016/5413520