A hybrid method for a Project Scheduling Problem
This work deals with a project scheduling problem where the tasks consume resources to be activated, but start to produce them after that. This problem is known as Dynamic Resource-Constrained Project Scheduling Problem (DRCPSP). Three methods were proposed to divide the problem into smaller parts a...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Sociedade Brasileira de Pesquisa Operacional
2014-04-01
|
Series: | Pesquisa Operacional |
Subjects: | |
Online Access: | http://www.scielo.br/scielo.php?script=sci_arttext&pid=S0101-74382014000100010&lng=en&tlng=en |