Evaluation of time when evacuation of production site personnel begins. Ways to overcome the challenge on example of compressor shop
The article describes a method for estimating start time of evacuation of personnel working in a machine room of a gas compressor shop operated by a pipeline company. The method provides two options for estimating evacuation start time depending on reliability of a notification and evacuation cont...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Perm National Research Polytechnic University
2016-06-01
|
Series: | Perm Journal of Petroleum and Mining Engineering |
Subjects: | |
Online Access: | http://vestnik.pstu.ru/get/_res/fs/file2.pdf/5816/Evaluation+of+time+when+evacuation+of+production+site+personnel+begins.+Ways+to+overcome+the+challenge+on+example+of+compressor+shopfile2.pdf |