Operation of an Anaerobic Baffled Reactor for Sulfate Removal of Amirkabir Industrial Estate Wastewater
In this study, the performance of an anaerobic baffled reactor (ABR Pilot 100 l and six compartments) for sulfate removal from the wastewater from Amirkabir Industrial Estate was investigated. The reactor was started with a hydraulic retention time (HRT) of 25 h at 35°C to be gradually reduced to 3....
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Water and Wastewater Consulting Engineers Research Development
2010-06-01
|
Series: | آب و فاضلاب |
Subjects: | |
Online Access: | http://www.wwjournal.ir/article_1519_feba739f1a3a492942ed5bc2a5acffca.pdf |