Implementación de ensanchadores y centralizadores Protech CRB para mejorar viajes y corridas de revestimiento en pozos del piedemonte llanero colombiano
The aim of this project is the technical evaluation of two new technologies (hole enlargers and Protech CRB centralizers) implemented by the company equion energia Limited to reduce pipe tripping and casing/liner running times during the drilling of wells at Colombian Piedemonte Llanero oilfi elds....
Main Authors: | , , |
---|---|
Format: | Article |
Language: | Spanish |
Published: |
Universidad Industrial de Santander
2015-12-01
|
Series: | Revista Fuentes El Reventón Energético |
Subjects: | |
Online Access: | https://doi.org/10.18273/revfue.v13n2-2015006 |