A Design of a 345-kV Electric Power Transmission Line Interlinking Ramu and Rouna Grids in Papua New Guinea
According to PNG Power Limited (PPL), Papua New Guinea’s peak power demand is expected to increase from 210 MW in 2012 to 347 MW in 2026. Under the current state of the power sector in Papua New Guinea (PNG), it is critical to implement measures to cope with the increasing power demand to promote in...