Economic lot scheduling problem with consideration of money time value
The economic lot scheduling problem (ELSP) is a challenge between sequencing and lot sizing. In this problem, several products must be produced on a single machine in a cyclical production pattern and the primary goal is to minimize the total setup and holding expenditures. Since time affects the va...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Growing Science
2010-06-01
|
Series: | International Journal of Industrial Engineering Computations |
Subjects: | |
Online Access: | http://growingscience.com/ijiec/VOL1/IJIEC_2010_15.pdf |