Economic lot scheduling problem with consideration of money time value

The economic lot scheduling problem (ELSP) is a challenge between sequencing and lot sizing. In this problem, several products must be produced on a single machine in a cyclical production pattern and the primary goal is to minimize the total setup and holding expenditures. Since time affects the va...

Full description

Bibliographic Details
Main Authors: Maryam Mokhlesian, Seyyed Mohammad Taghi Fatemi Ghomi, Fariborz Jolai
Format: Article
Language:English
Published: Growing Science 2010-06-01
Series:International Journal of Industrial Engineering Computations
Subjects:
Online Access:http://growingscience.com/ijiec/VOL1/IJIEC_2010_15.pdf