Groundwater in the Perthus Tunnel: feedback after excavation

This work presents the experiences gained during the construction of the Perthus high-speed railway tunnel (8.4 km long), as regards water inflow management, analysis of the impact on surface-waters and groundwater, monitoring of piezometers and water quality control, soil injections. The excavatio...