Training of argon arc welding process for tube aluminum busbar melting pole in UHV power station

The development of power grid is showing that voltage level is from low to high, networking scale is from small to large, level of automation is from weak to strong.. [1] as the hub of power grid connection between substations, the capacity and automation level of substations is also improving. The...

Full description

Bibliographic Details
Main Author: Liyang Hanyang
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:MATEC Web of Conferences
Online Access:https://doi.org/10.1051/matecconf/201817503010