Discrete-Element Analysis of the Excavation Performance of an EPB Shield TBM under Different Operating Conditions

This study used a discrete-element analysis to predict the excavation performance of a 7.73 m-diameter earth pressure balance (EPB) shield tunnel boring machine (TBM). The simulation mainly predicted several excavation performance indicators for the machine, under different operating conditions. The...

Full description

Bibliographic Details
Main Authors: Byungkwan Park, Chulho Lee, Soon-Wook Choi, Tae-Ho Kang, Soo-Ho Chang
Format: Article
Language:English
Published: MDPI AG 2021-05-01
Series:Applied Sciences
Subjects:
Online Access:https://www.mdpi.com/2076-3417/11/11/5119