Effects of a Delayed Expansion of Interconnector Capacities in a High RES-E European Electricity System

In order to achieve a high renewable share in the electricity system, a significant expansion of cross-border exchange capacities is planned. Historically, the actual expansion of interconnector capacities has significantly lagged behind the planned expansion. This study examines the impact that suc...

Full description

Bibliographic Details
Main Authors: David Ritter, Roland Meyer, Matthias Koch, Markus Haller, Dierk Bauknecht, Christoph Heinemann
Format: Article
Language:English
Published: MDPI AG 2019-08-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/12/16/3098