Planning, Scheduling and Controlling Long Term Projects
The challenge that major projects face is that from design to start-up, the mega infrastructure projects can take up to 10-20 years, maybe even longer. The same applies when we need to control the whole life cycle cost of a project: in research of cost overruns, the general opinion is that these pro...
Main Author: | Gianluca Di Castri |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Bologna
2018-12-01
|
Series: | In_Bo |
Subjects: | |
Online Access: | https://in_bo.unibo.it/article/view/8820 |
Similar Items
-
Feasibility assessment and optimal scheduling of water supply projects
by: Bakkoury, Zohra
Published: (2002) -
Analytical Support to Norwegian Long-Term Defence Planning
by: Sigurd Glærum, et al.
Published: (2016-09-01) -
Planning for Long-Term Care
by: Yauk, Jessica Ann
Published: (2020) -
The importance of logic planning in case of IT and innovation projects
by: Judit Kiss, et al.
Published: (2009-12-01) -
Characteristics of basin inflows a statistical analysis for long-term/mid-term hydrothermal scheduling
by: Sutlović Elis, et al.
Published: (2014-01-01)