Planning, Scheduling and Controlling Long Term Projects
The challenge that major projects face is that from design to start-up, the mega infrastructure projects can take up to 10-20 years, maybe even longer. The same applies when we need to control the whole life cycle cost of a project: in research of cost overruns, the general opinion is that these pro...