Increasing the capacity of intersections by short traffic lanes

When during peak hours intersections are loaded with 5000÷8000 veh/h, installation of short traffic lanes – one or two in each direction – is one of the most economical solutions for their reconstruction. Technical Construction Regulations (STR 2.06.01:1999) of Lithuania do not provide specific rec...

Full description

Bibliographic Details
Main Authors: Antanas Klibavičius, Gražvydas Mykolas Paliulis
Format: Article
Language:English
Published: Vilnius Gediminas Technical University 2012-03-01
Series:Transport
Subjects:
Online Access:https://journals.vgtu.lt/index.php/Transport/article/view/4914