An Integrated Transmission Expansion and Sectionalizing-Based Black Start Allocation of BESS Planning Strategy for Enhanced Power Grid Resilience
This paper proposes a new comprehensive integrated planning strategy for the resilience enhancement of power system, including determining the transmission expansion and sectionalizing-based optimal black start (BS) resources allocation of battery energy storage system (BESS) during extreme events....
Main Authors: | Fang Yao, Tat Kei Chau, Xinan Zhang, Herbert Ho-Ching Iu, Tyrone Fernando |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2020-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/9159694/ |
Similar Items
-
Chopper-Based Control Circuit for BESS Integration in Solar PV Grids
by: B V Rajanna, et al.
Published: (2021-03-01) -
Grid-Scale BESS for Ancillary Services Provision: SoC Restoration Strategies
by: Giuliano Rancilio, et al.
Published: (2020-06-01) -
A Study on Sizing of Substation for PV With Optimized Operation of BESS
by: Yeuntae Yoo, et al.
Published: (2020-01-01) -
Reclosing scheme using synchronism checking for utilization of BESS in distribution system
by: Hun-Chul SEO, et al.
Published: (2017-12-01) -
Fuzzy Logic-Based Operation of Battery Energy Storage Systems (BESSs) for Enhancing the Resiliency of Hybrid Microgrids
by: Akhtar Hussain, et al.
Published: (2017-02-01)