An Integrated Transmission Expansion and Sectionalizing-Based Black Start Allocation of BESS Planning Strategy for Enhanced Power Grid Resilience

This paper proposes a new comprehensive integrated planning strategy for the resilience enhancement of power system, including determining the transmission expansion and sectionalizing-based optimal black start (BS) resources allocation of battery energy storage system (BESS) during extreme events....

Full description

Bibliographic Details
Main Authors: Fang Yao, Tat Kei Chau, Xinan Zhang, Herbert Ho-Ching Iu, Tyrone Fernando
Format: Article
Language:English
Published: IEEE 2020-01-01
Series:IEEE Access
Subjects:
Online Access:https://ieeexplore.ieee.org/document/9159694/