Use of pilot tunnel method to overcome difficult ground conditions in Karavanke tunnel

The pilot tunnel method was used in design of Karavanke tunnel to address the two main challenges, which are expected during the construction of the second tube. The first challenge is large convergence displacements in squeezing conditions of Permian and Carboniferous clastic rock of low capacity a...

Full description

Bibliographic Details
Main Author: Jovičić Vojkan
Format: Article
Language:English
Published: Society for Materials and Structures testing of Serbia 2018-01-01
Series:Građevinski Materijali i Konstrukcije
Subjects:
Online Access:https://scindeks-clanci.ceon.rs/data/pdf/2217-8139/2018/2217-81391801037J.pdf