Estimation of parameters in a distributed precipitation-runoff model for Norway

A distributed version of the HBV-model using 1 km<sup>2</sup> grid cells and daily time step was used to simulate runoff from the entire land surface of Norway for the period 1961-1990. The model was sensitive to changes in small scale properties of the land surface and the climati...

Full description

Bibliographic Details
Main Authors: S. Beldring, K. Engeland, L. A. Roald, N. R. Sælthun, A. Voksø
Format: Article
Language:English
Published: Copernicus Publications 2003-01-01
Series:Hydrology and Earth System Sciences
Online Access:http://www.hydrol-earth-syst-sci.net/7/304/2003/hess-7-304-2003.pdf