Estimation of parameters in a distributed precipitation-runoff model for Norway
A distributed version of the HBV-model using 1 km<sup>2</sup> grid cells and daily time step was used to simulate runoff from the entire land surface of Norway for the period 1961-1990. The model was sensitive to changes in small scale properties of the land surface and the climati...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Copernicus Publications
2003-01-01
|
Series: | Hydrology and Earth System Sciences |
Online Access: | http://www.hydrol-earth-syst-sci.net/7/304/2003/hess-7-304-2003.pdf |