Recovery time reduction of a damaged 6-35 kV transmission line after double earth fault applying the iteration fault location method
The task of determining the fault location on a power line is difficult and the longest operations to restore damaged areas of the network. Determining fault location with double earth faults is a priority due to the high wear of medium voltage networks and the absent of currently accurate algorithm...
Main Authors: | Kulikov A.L., Osokin V.J., Obalin M.D. |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://doi.org/10.1051/e3sconf/20185801007 |
Similar Items
-
Determining single-phase earth fault location with applying short-term double earth fault
by: Kulikov A.L., et al.
Published: (2019-01-01) -
Improvement of algorithms for voltage circuits fault detection in relay protection terminal of 6-35 kV electrical networks
by: Vukolov Vladimir, et al.
Published: (2019-01-01) -
DETECTION OF FAULT LOCATION ON THE POWER LINES 6–35 kV WITH UNILATERAL FEED
by: F. A. Romaniuk, et al.
Published: (2014-10-01) -
Adaptation of power lines fault location methods to voltage characteristics deviations
by: Obalin Mixail, et al.
Published: (2019-01-01) -
Design and Implementation of Fault Location Cloud Platform for 161kV Transmission Networks
by: Min-Jui Huang, et al.
Published: (2015)