Recovery time reduction of a damaged 6-35 kV transmission line after double earth fault applying the iteration fault location method

The task of determining the fault location on a power line is difficult and the longest operations to restore damaged areas of the network. Determining fault location with double earth faults is a priority due to the high wear of medium voltage networks and the absent of currently accurate algorithm...

Full description

Bibliographic Details
Main Authors: Kulikov A.L., Osokin V.J., Obalin M.D.
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:E3S Web of Conferences