Construction delay of a penstock
Uncertainties are not always quantifiable and particularly those that result from a poor management. This is the case of the construction of a penstock of a hydroelectric project. The penstock is an assembly of imbricated cylindrical blocks. The steel blocks deformed during transportation and storag...