Construction delay of a penstock

Uncertainties are not always quantifiable and particularly those that result from a poor management. This is the case of the construction of a penstock of a hydroelectric project. The penstock is an assembly of imbricated cylindrical blocks. The steel blocks deformed during transportation and storag...

Full description

Bibliographic Details
Main Authors: El Tani Mohamed, Hage Chehade Fadi
Format: Article
Language:English
Published: EDP Sciences 2019-01-01
Series:MATEC Web of Conferences
Online Access:https://www.matec-conferences.org/articles/matecconf/pdf/2019/30/matecconf_incer2019_01011.pdf