Assessment of Residual Service Life of Cast Bodies of Control Valves of 220 MW Power Units

In the regulatory documents of the Ministry of Energy and Coal Industry of Ukraine, the beyond-design operating life of the high-energy equipment of 220 MW power units is limited to the operating life of 220 thousand hours and 800 start-ups. To date, the high-temperature cast bodies of the control v...

Full description

Bibliographic Details
Main Authors: Olha Yu. Chernousenko, Dmytro V. Ryndiuk, Vitalii A. Peshko
Format: Article
Language:English
Published: NAS of Ukraine, A. Pidhornyi Institute of Mechanical Engineering Problems 2020-12-01
Series:Journal of Mechanical Engineering
Subjects:
Online Access:https://journal-me.com/wp-content/uploads/2021/01/2020_4_3_eng.pdf