Assessment of Residual Service Life of Cast Bodies of Control Valves of 220 MW Power Units
In the regulatory documents of the Ministry of Energy and Coal Industry of Ukraine, the beyond-design operating life of the high-energy equipment of 220 MW power units is limited to the operating life of 220 thousand hours and 800 start-ups. To date, the high-temperature cast bodies of the control v...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
NAS of Ukraine, A. Pidhornyi Institute of Mechanical Engineering Problems
2020-12-01
|
Series: | Journal of Mechanical Engineering |
Subjects: | |
Online Access: | https://journal-me.com/wp-content/uploads/2021/01/2020_4_3_eng.pdf |