Commercial building flooring failure caused by swelling of the foundation layers
The work describes the damage, testing and method of repairing the flooring. The flooring formed part of a commercial pavilion covering an area of approx. 1200 m2. Significant damage in the form of cracks and elevations of up to a height of almost 80 mm were detected in the flooring. Geodetic, labor...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2019-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://www.matec-conferences.org/articles/matecconf/pdf/2019/33/matecconf_icsf2019_04003.pdf |