Metaheuristic Algorithms for Proactive and Reactive Project Scheduling to Minimize Contractor’s Cash Flow Gap under Random Activity Duration
This paper investigates the project scheduling problem to minimize the maximum cash flow gap of contractors under random activity duration. A comprehensive optimization model with time buffers added to the baseline schedule by project proactive scheduling and the schedule adjustment cost determined...