ATLAS Sim@P1 upgrades during long shutdown two

The Simulation at Point1 (Sim@P1) project was built in 2013 to take advantage of the ATLAS Trigger and Data Acquisition High Level Trigger (HLT) farm. The HLT farm provides around 100,000 cores, which are critical to ATLAS during data taking. When ATLAS is not recording data, such as the long shutdo...

Full description

Bibliographic Details
Main Authors: Berghaus Frank, Brasolin Franco, Di Girolamo Alessandro, Ebert Marcus, Leavett-Brown Colin Roy, Lee Chris, Love Peter, Pozo Astigarraga Eukeni, Scannicchio Diana Alessandra, Schovancova Jaroslava, Seuster Rolf, Sobie Randall
Format: Article
Language:English
Published: EDP Sciences 2020-01-01
Series:EPJ Web of Conferences
Online Access:https://www.epj-conferences.org/articles/epjconf/pdf/2020/21/epjconf_chep2020_07044.pdf